0

JZ ArtsMascotWorkshop
Placeholder. Three finished heads matched to one standard

For brand and marketing teams

Matched to
Your guideline
Fleet
Every unit against one master
Patterns
Archived permanently

A mascot is the only piece of brand collateral that walks around on its own, gets photographed by strangers, and represents you with nobody standing over it. It has to be right.

  1. 01

    Guideline compliance

    Colours and proportions matched to your reference rather than approximated, and checked here before anything is signed off.

  2. 02

    Consistency across units

    Every suit in a fleet identical, because sooner or later two of them end up in the same photograph.

  3. 03

    Delivery against fixed dates

    We have been building to campaign deadlines since 1994.

  4. 04

    Direct contracting

    Invoiced under the registered entity, with no agency layer in between if you would rather not have one.

  5. 05

    Longevity

    Built to survive a season of genuine use, with repair and refurbishment sitting behind it.

  6. 06

    Build once, reorder for years

    Your character's pattern set stays archived here, so replacements and extra units come back identical, faster, and for less than the first one cost.

Placeholder. Fur swatches fanned in an arc

A character usually outlives the campaign it was made for. It shows up at trade fairs, in schools, on somebody's phone, for years after the brief is closed.

Which makes the build a long-term decision dressed up as a one-off purchase. We would rather you treated it as the former.

Working with us

Send the character and what you need it for. If you have a guideline, send that too. We will come back with a build-ready design, a price, and an honest read on your date before you commit to anything.

Tell us what you need built.

Send the character, the date and how many units. If the date cannot be done, you will hear that on the first reply, before you build a plan around us.

Workshop
R-248, Near Mustafa Mosque, Shadman Town 14-A
City
Karachi, Pakistan
Build time
2-3 weeks from approved design